Ajaokuta Steel Project is located on 24,000 hectares of sprawling green-field land-mass. The Steel Plant itself is built on 800-hectares of land. The chosen Technology for Steel Production is the time tested Blast-Furnace – Basic Oxygen Furnace route for Steel Production.

The Ajaokuta integrated steel complex was conceived and steadily developed with the vision of erecting a Metallurgical Process Plant cum Engineering Complex with other auxiliaries and facilities. The complex is meant to be used to generate important upstream and downstream industrial and economic activities that are critical to the diversification of our economy into an industrial one.

Read more on website